Installed a ceiling-mounted projector and motorized screen at the event center. Original power source options near ceiling junction boxes were unsuitable, as they were dedicated to lighting. Located an appropriate receptacle circuit near the back windows and removed an emergency light to access it. Ran new wiring to supply power to both the projector and screen.
Using the manufacturer’s distance calculator, determined projector placement, and mounted the screen using two 10 mounts across the ceiling beams. Initially installed the screen and receptacle were installed in reverse orientation based on the manual images, requiring relocation for proper operation. Installed the projector, noting a compatibility issue between the projector and the four-point mount provided, which only allowed for two secure connections. Confirmed stability with Dorian. All components are tested and working. The site was cleaned upon completion.