Key Milestone Achieved: Foundation & Plinth Beam Work Completed!
We are excited to announce the successful completion of the Foundation and Plinth Beam work for our new residential project! This stage is crucial as it determines the structural stability and longevity of the entire home.
As engineers, we ensure that every critical step adheres strictly to the structural blueprint, guaranteeing a strong and safe start.
Key Technical Details from the Site:
Concrete Grade: Used M20 grade concrete for all foundation members (Footings, Columns, and Plinth Beam) to ensure optimal compressive strength.
Steel Reinforcement: Reinforced with Fe 550D TMT steel bars, cut and bound precisely as per design specifications for maximum load-bearing capacity.
Protection: Applied essential Anti-Termite Treatment and utilized high-quality Waterproofing admixture to protect the foundation from moisture and pests.
Precision: Achieved accurate levels and right angles across the entire plot using Laser Leveling Instruments before casting.
A solid foundation is the backbone of your dream home. We are now moving on to the next phase: Column erection and Wall construction.
#ConstructionUpdate #FoundationWork #CivilEngineering #HomeBuilding #StructuralIntegrity #YourCityContractor.