New construction punch lists address items requiring completion or correction. Riley Plumbing Heating And Air returned to this South Lake Tahoe property for final plumbing installation. The crew connected sink drains, adjusted shower head heights to match after tile removal, and hooked up both kitchen faucets. Gas lines for two fireplaces received shutoff valves and final connections. The laundry room gas line got a 90-degree fitting with shutoff. Toilet caulking was cleaned and reapplied uniformly across four fixtures. Cover plates were installed at all angle stops and supply lines. One toilet required flush mechanism adjustment. The master bath toilet now operates properly. Coordinating final plumbing with other trade completion requires flexibility in scheduling. Items like cover plates and fixture connections wait until finish work is done. Construction projects benefit from contractors who return promptly to complete punch list work. Learn more about new construction plumbing services for residential projects throughout South Lake Tahoe.