American Valve is a company out of Greensboro NC. They are moving locations and needed the storage pallet racking dismantled and removed. Because they are still operational, the project is going to consist of multiple phases. Dismantle, stack, palletize and removal of three rows of industrial pallet rack shelving. Each row had 7 sections with 3 shelf levels high. The crew arrived at 7:00am and the racking was removed and loaded on a flatbed truck by 2:00pm.
Pallet rack installation, dismantle, relocation and purchase in the following surrounding Greensboro cities: Kernersville NC, Colfax NC, Burlington NC, Whitsett NC, High Point NC, Thomasville NC, Lexington NC