2 decks that was brought back to life . All decking and handrails removed . All joist and connections was tighted up if need with screws replacing nails where needed . Joist tape was used to close off old nail holes and help prevent any more water intrusion into the joist lumber . All new decking, post hand handrail along with change of direction of steps with a landing added .