First fix wiring has now been completed for the extension project in Sunbury. All cabling for lighting, socket circuits, and power supplies to kitchen and utility areas has been installed as per the plans. Back boxes are in place and wiring routes have been confirmed with the client and builder.
Final checks carried out to ensure compliance with current regulations (BS7671), and circuit labeling has been noted for consumer unit termination during second fix.
Awaiting plastering to proceed before returning for second fix installation.