On November 15, 2024, Jeffrey completed an irrigation modification job in Charlotte. The work involved connecting and extending drip lines to Zones 2 and 3, including the installation of approximately 25 feet of tubing on the right side of the gate and 200 feet on the left side. The crew ensured that the lines were properly sleeved under the fencing and integrated into the existing plantings.