🚨 Sunday Emergency Call-Out! 🚨
Last week before Christmas, and a client’s underground service failed—right under 65m of concrete driveway! With no spare time to lose, the boys jumped straight into action.
In just two days, they:
🔧 Cut through 65m of concrete
🔧 Replaced the three-phase supply
🔧 Kept their full schedule on track
To make sure the client wasn’t left in the dark, we set them up with our portable hire generator for Sunday and Monday, keeping their home powered. By midweek, everything was complete, clean, and tidy—just in time for Chrissy! 🎄
Big shoutout to the team for their hard work and dedication to get it done! 💪
🌐 https://harriselectricalandsolar.com.au/