The master bathroom in Sunland Park gained a durable surface through tile floor installation supported by subfloor preparation completed before the setting work. We reinforced select areas with plywood, installed quarter inch backer board, applied thinset, and placed tile with consistent spacing to keep the layout clean. Grout work was completed and edges were detailed around fixtures so the finish stayed moisture resistant and easy to maintain. Want the best flooring service? Request a tile estimate with Floor Coverings International El Paso.