Every construction project requires coordination between the trades and a build schedule that makes sense.
This project manager insisted we install the septic system before they began the structural work on this remodel. So far, other contractors have driven over the tanks, detached the control panels, and damaged the conduit protecting the electrical circuits for the septic system. This system was not cheap to install in the first place. Repairs because of out-of-sequence work is even more expensive.
If you have an upcoming project that involves a modification to components of your septic system, please give us a call and let us help you save both time and money.
We dont charge for phone calls or answering questions. You literally have nothing to lose by calling.